Automist for Architects, Builders & Developers

Automist · For Architects, Builders & Developers

Automist, specified and delivered

Design, supply, installation and commissioning from a single specialist — designed to your drawings and brief, in line with Plumis guidelines, and delivered on site to your programme.

Ready for your site

Not just an installer — a contractor who’s at home on a live commercial job.

CSCS carded

Site-ready and compliant for access to commercial and construction sites.

Building-site experienced

Used to working alongside other trades on active builds, safely and cleanly.

Delivered to programme

Commercial contracts completed on time and coordinated around your schedule.

Fully certified

Every system commissioned, tested and certified to hand over with confidence.

One point of contact

Nigel oversees every stage personally — no sub-subbing, no confusion.

Design-led

Full specification and drawings to support your building-control submission.

RAMS & site paperwork

Full risk assessments, method statements and H&S documentation provided ahead of every job.

Fully insured

£2m public liability and £10m employers’ liability, plus professional indemnity and product liability. Certificates on request.

The process, step by step

The same rigour as the homeowner route — condensed for those who know the drill.

1

Brief & drawings

Send the requirement and your plans (PDF or image). We design from these — no site visit needed at this stage.

2

Design & proposal

A system designed to the brief and in line with Plumis guidelines, with a full specification, drawings and proposal for your submission.

3

Building control approval

The design supports your building-control approval; a fire engineering report can be provided where required.

4

Site visits & specification

We’re happy to meet on site whenever it suits you — often several times across a project. Ahead of any site work we provide full RAMS, method statements and paperwork, and issue a clear spec of what’s needed from your plumber, electrician and build team to keep the programme moving.

5

First fix, second fix & commissioning

First fix before the walls close, second fix and commissioning once finished — coordinated to your build programme. Certificate issued following commissioning and payment.

6

Aftercare & annual service

Ongoing servicing to keep every system compliant and handover-ready.

Where a fire engineer needs to get involved

Automist’s tested design parameters cover a room up to around 80m² with a 3.5m ceiling height — within that, most projects go ahead on standard guidance alone. Outside it, a full bespoke fire engineering assessment is the route in, using BS 7974 principles to justify the design. A few other thresholds worth knowing: Approved Document B requires sprinklers or suppression above 11m; BS 8458 covers residential water mist up to 45m, above which the Authority Having Jurisdiction must be consulted on whether an alternative system or extra measures are needed; and in Scotland, every use requires a mandatory site-specific alternative-design submission to the local verifier. None of this replaces your other required fire safety measures — smoke detection, passive fire protection and compartmentation, and smoke ventilation under Approved Document B and BS 9991 still need to be fully complied with regardless. We already work alongside fire engineers who know the system, so where one needs to sign off the specific design, that’s factored into the programme from the start.

Standards & compliance

The old British standard for residential water mist, BS 8458, has been withdrawn — not because anything was found wrong with it, but because the industry is transitioning to the new BS EN 14972-17:2025. Plumis has confirmed BS 8458:2015 remains a valid, recognised basis for system use and specification on new projects as well as existing ones, backed by the British Standards Institution’s own statement that withdrawal doesn’t mean products or certifications built to it can no longer be used or recognised. Automist has also passed the suite of BS EN 14972-17 fire tests, verified by an independent report from Baltic Fire Laboratories (TRBFL2525-1). We can talk you through exactly what that means for your building-control submission.

Send us your plans

Send over the requirement and your drawings (PDF or image) and we’ll come back with a full design proposal and specification for your submission — no site visit needed at this stage.


    PDF, JPG, PNG, DWG or DXF — up to 15MB. No plans yet? Leave this blank and describe the project above instead.